    Piston Flow Switch Installation Diagram Guide

    Time: 2025-07-18 11:07:59 Click:0

    Here is the professional English translation of the ?Piston Flow Switch Installation Diagram Guide?, preserving technical accuracy and formatting:


    ?? ?I. Core Installation Standards?


    Flow Direction Control?


    Horizontal Installation?:

    Water flow direction ?must strictly align? with the arrow indicator on the housing. Pipeline flange coaxiality error ≤ 0.5mm to prevent seal failure or measurement drift?.

    Vertical Installation?:

    Upward flow only? (Diagram: Arrow facing upward). Reverse installation causes piston failure due to sediment accumulation. Downward flow induces ?structural damage??.


    Location & Accessories?


    For upstream bends/valves, reserve a ?straight pipeline ≥4× pipe diameter? (Example: 200mm for DN50 pipe) to stabilize flow?.

    Install an ?80-mesh filter? (Diagram: Y-strainer upstream) to block debris. Seal threaded joints with PTFE tape?.

    ? ?II. Typical Application Scenarios?


    Fire Protection System?


    Clamp-mounted on fire water pipes (Diagram: Flanged base with clamp):

    Wiring: Brown → 24V DC (+), Black → (-), Blue/Yellow → Pump control terminal?.

    Red LED lights up (≥20% flow), NO contact closes to activate pump?.


    Industrial Cooling Cycle?


    Vertical SS housing on cooling tower return line (Diagram: Pump discharge section), 100Bar rating:

    Contacts linked to PLC. Alarm triggers when flow <15L/min?.

    ?? ?III. Commissioning & Maintenance?

    Electrical Test?

    Connect 24V DC (Red/Brown) → Gradually increase flow → Observe LED switch point (e.g., 20% range) → Lock adjustment screw?.

    Periodic Maintenance?

    Monthly: Clean filter & probe deposits.

    Biannually: Recalibrate trigger point (±5% accuracy).

    For corrosive media: Install titanium alloy sleeve?.


    Note?: All diagrams emphasize ?flow direction compliance? and ?buffer zone reservation? to avoid turbulence. Post-installation dry-run test is mandatory (NC contact opens / NO contact closes)?.


    Key Terminology:

    同軸度誤差 → ?Coaxiality error?

    過濾網(wǎng) → ?Strainer?

    生料帶 → ?PTFE sealing tape?

    常開觸點(diǎn) → ?NO (Normally Open) contact?

    紊流 → ?Turbulence?

    斷流測試 → ?Dry-run test?


    This translation maintains critical technical parameters, safety symbols (??→?), and visual markers (??/??), ensuring readiness for international engineering documentation.